By Justin Crane, FAIA

Every year, approximately 1 billion square feet of buildings (roughly the size of Manhattan) are demolished and replaced with new construction in the United States, according to a recent report by the AIA and the National Trust for Historic Preservation. Meanwhile, nearly half of America’s 125 million buildings are now older than fifty years. Since building reuse can avoid 50-75% of embodied carbon emissions that an identical new building would generate, the stakes of renovating existing buildings and adapting them to meet modern programming needs and performance standards are high.

As the effects of climate change evolve and we see more defining characteristics of the Anthropocene, research and experimentation with efficiently reworking our existing supply of buildings is becoming increasingly important. As such, CambridgeSeven takes a deeply sustainable approach to adaptive reuse across a variety of building types from throughout the 20th century. We presented our explorations and findings at Greenbuild Los Angeles earlier this month.

The Background

Old courthouse exterior, 1890
Old courthouse exterior, 1890

As a case study, we focused on the renovation of 26 Court Street, municipal offices and constituent interaction space for the City of Boston.  The project site is notable and historic, as it is the longest continuously owned parcel of land by the City, dating to the 1630’s.

Until 1836, it was the site of the City’s first jail – notably, Captain Kidd’s incarceration in the 1690’s – as well as a setting for Nathaniel Hawthorne’s The Scarlet Letter

In 1836, Boston Gaol was replaced by a courthouse, which was the site of the successful rescue of Shadrach Minkins from being returned to slavery under the Fugitive Slave Act in 1851, and the failed rescues of Thomas Sims in 1850 and Anthony Burns in 1854.

Map of downtown Boston, 1912

In 1912, the courthouse was replaced by the building that stands today. Designed by architect Edward T. P. Graham, the Boston Landmarks Commission later described it as “one of Boston’s best examples of a public building executed in the Classical Revival style” and determined that the building could be eligible for listing on the National Historic Register.

Although the project did not pursue historic tax credits or landmark status, this public accolade required that we clearly determine our own project renovation goals, both historic and environmental, to maintain the integrity of the architecture.

Our historic goals:

  • We determined
    26 Court Street with original statues visible at the top of the north façade, 1920

    that the interior, which had been replaced in 1968 to be the headquarters of Boston Public Schools, would be gut renovated.

  • Together with Lisa Howe at BCA, our team decided that we would meet the Secretary of the Interior’s Historic Preservation Standards for the exterior of the building.
  • Finally, the south side of the building could be modified for a removable panel for new electrical equipment. This was done with historic justification, as the facade had been designed to be sacrificial, originally for a much larger, longer version of the same building.
  • We modeled the City’s environmental goals, including:
  • Mayor Marty Walsh’s 2019 Executive Order requiring new municipal buildings to target a Net Zero Carbon Standard
  • Mayor Michelle Wu’s 2025 Net Zero Carbon zoning initiative
  • A low site EUI of 23 kBTU/SF
  • A minimum achievement of LEED Gold, while targeting the more stringent LEED Platinum.

With these goals in place, we were ready to tackle the complexities of the project.

The Systems

Careful design of the ceiling allowed for hiding new building systems in soffits.

Building systems were transformed, replacing steam radiators fed by gas-fired boilers with a fossil-fuel-free air-source heat pump system.

Replacing the mechanical systems required substantial space that was, of course, not part of the original 1912 design. We needed space for rooftop mechanical equipment which we hid away from the principle, north facade of the building as much as possible. The dunnage for the mechanical system also did double-duty as seismic bracing for the building’s brick parapets.

The floor-to-floor heights, as low as 10’-6”, did not easily accommodate the new mechanical runs, so we designed ceilings with a soffit space marking the transition from the main circulation corridor to open workspace – while also providing space for pipe and duct runs.

The basement was substantial, having been home to three historic coal fired boilers that served as the original heating system. These were replaced with a vault for two new electric transformers that could not have been accommodated in the typical sidewalk utility vault given the tight urban context.

Historic coal-fired boilers (left); new transformer vault (right).

The Envelope

View into existing exterior wall showing original terracotta block and asphaltic waterproofing.

Restoring the historic envelope while making it air-tight and energy-efficient may have been the greatest challenge, as the architecture is representative of a transitional period between mass masonry exterior walls and steel superstructure with masonry cladding. The original composition was limestone cladding, clay brick backup, an experimental asphaltic weatherproofing system – new to buildings of this transitional period – air space for steel structure, and terracotta block to provide fireproofing and a substrate for the plaster finish.

The large air space provided a good opportunity for insulation but required extensive testing to determine material compatibility, with a focus on historic materials that are unusual, such as the asphaltic water barrier; or highly variable in quality, such as the clay brick backup.

Tests included:

  • WUFI Pro software to determine the potential for mold growth on interior brick surface
  • Water absorption, dry density, and saturation testing on 18 brick samples at all four facades
  • Frost Dilatometry, to determine the brick’s resistance to freeze/thaw
  • Adhesion Evaluation of the asphaltic water barrier

This material testing helped us add R-24 of insulation, which was accomplished through a combination of low-carbon closed-cell spray foam and mineral wool, providing an assembly that was both energy-efficient and airtight, while keeping existing materials in place except for the terracotta block and interior plaster finish.

Cast iron detailing at windows before construction.

Window replacement for energy efficiency and improved air sealing also presented unusual challenges. We restored the historic cast iron fascias and mullions in place, which necessitated installation of the windows from the interior. The tint of windows replacing historic glazing is also key to restoration. Accordingly, we chose a clear glass with a VLT of 67% with a tint thought to be closest to the historic tint of the windows.

New windows and restored cast iron following restoration.

The Results

Ultimately, we determined that our renovation of 26 Court Street, including restoration of the façade and reuse of the superstructure, achieved a 69% reduction in carbon dioxide emissions compared with new construction. This environmental achievement could only happen through fossil-fuel-free building systems, an efficient façade assembly, and the long-term utility of a heritage building.

As we continue our commitment to build better using the assets we already have, and to encourage others to preserve and restore our historic architecture, we offer these four key takeaways:

  1. Set clear environmental and historic goals, agreeing on what one is willing to give up and what one must keep to maintain the integrity of the historic building.
  2. Understand the space requirements of new, energy-efficient building systems and plan for them during the feasibility study.
  3. Organize the project team for quantitative testing on historic materials that are unusual, such as the asphaltic water barrier we encountered, or highly variable, such as clay brick.
  4. Take advantage of sustainable strategies integrated into the original architecture, such as high windows that allow for quality views, skinny floorplates, and a window-to-wall ratio that allows for new insulation and a fossil fuel free, energy-efficient historic building.

Related Stories

BUILDINGS Magazine - May 9, 2025

How Municipalities are Serving Constituents with New Types of Civic Architecture

Principals Stefanie Greenfield and Justin Crane discuss working with municipalities on civic projects that change the community for the better.

View Post
Ethical supply chains - CambridgeSeven

Ethical Building Materials

How to support more ethical, equitable, and responsible building supply chains and labor practices.

View Post
Functional Facades - CambridgeSeven

Functional Facades

Options for sustainability through custom facade design

View Post